Silt Drove Rosehill Crossing

Rosehill Rail

Silt Drove UVC case study

Client: TES 2000
Project: Silt Drove Rosehill Crossing
Details: Install a 10.8m Rosehill interlocking RRAP

Premier Rail installed a 10.8m Rosehill interlocking RRAP for our client, TES 2000.

The RRAP was installed on a UWC so public protection was essential, therefore Premier Rail also installed Rosehill Anti-tresspass guards.